Plant Design Information
Type (BWR or PWR) & manufacturer: BWR 3/4 – Mark 1 containment
Manufacturer: General Electric
Cooling water source: Connecticut River with once through cooling towers (seasonal)
Primary Containment
Height: 105 feet 10 7/32 inches
Steel Liner Thickness: 11/16 to 2 1/2 inches
Concrete Reinforcement Thickness: 4 to 6 feet thick
Milestone Dates
Commercial operation: November, 1972
License renewal status: Nuclear Regulatory Commission renewed Vermont Yankee’s license for operation March 21, 2012 – March 21, 2032
Plant Operation
Maximum dependable capacity: 650 MW
Last power uprate of approximately 100 MW date: May 2006
Vermont Yankee produces power approximately equal to 80% of the total energy demand of Vermont
Number of employees: 650